Desperate Search Continues for Trapped Hydropower Workers in Nepal
By Editor • August 31, 2026 • 2 min read
As hopes dwindle, rescuers in Nepal are intensifying efforts to locate over 600 workers trapped in a network of mud-filled tunnels following catastrophic floods. Utilizing explosives to penetrate the hillside at the Trishuli-3A hydropower site, crews are racing against time to provide air and access to those believed to be alive.
The situation is dire, with the nation's disaster management authority confirming that the death toll from the flooding has risen to 939, while 3,925 individuals remain unaccounted for, including 592 foreign nationals. Prime Minister Balendra Shah reported that 279 people have been successfully rescued from the affected areas.
Families of the missing workers are holding onto hope, despite the grim circumstances. "I still have a 50% hope that he is alive because there is an oxygen system inside," said Sita Pandey, whose husband was at the hydropower plant when the floods struck. Meanwhile, Anushila Bhandari, waiting for her husband, expressed her longing, stating, "I wish we could find him. I wish he would come home."
The rescue operation is a collaborative effort involving both Chinese and Nepalese military personnel, along with experts from India, Korea, and Australia. However, challenges persist as rescuers struggle to locate the tunnels amidst a transformed landscape. Australian engineer Arnold Dix described the scene as resembling a "lunar landscape," complicating the search.
As time passes, the families' anxiety grows. Jiban Khadka, another relative of a trapped worker, emphasized the urgency, stating, "The longer it takes, the more our hope dies. This operation must move much faster because every second is meaningful to us." Some families are reporting that returning workers have seen evidence of those still trapped inside the tunnels, fueling their desperate hopes for a timely rescue.
In a tragic twist, authorities in Chitwan are dealing with the aftermath of the floods, as makeshift burials for unidentified bodies are taking place due to an overwhelming number of dead, with nearly 300 bodies washing ashore. Chief district officer Ganesh Aryaal noted the lack of resources, stating, "We had to choose this last alternative of temporary burial system. We are really overwhelmed." Meanwhile, in Tibet, the reported death toll stands at 16, with 546 people still missing amidst strict government censorship of the details.
Source: www.bbc.co.uk
#flood disaster #hydropower #Nepal #rescue operations #Trishuli River