To deal with earthquakes and winds, the plates are related by one another for a horizontal stiffness
The flooring bend and join with out ramps
the plates tilt one another
1/7
Mission info:
identify: 4 parking heaps
architect: Christian Kerez | @christiankerez
location: Muharrainq, Bahrain
Mission architect: Caio Barboza
Commissioners: Bahrain Authority of Tradition and Antiquities (Learn), Sheikha extra bint Mohammed al-Khalif
Web site Workplace Crew: Caio Barboza, Dennis Saitello, Lisa Kusaka
Mission crew: Daniel Carlson, Laura Paluch, Raoul Dubois, Jens Knöpfel, Matthias Letert, Apolinário Soares, Jonas Løland, Sofia Blanco Santos, Christiana Pitsillidou, Korbinian Hubera, Korbinian Hubera, Siwen Wang, Anna Molodij, Yi Wang, Viktoriya Maleva, Oleksandra Nikitenko
engineering: Dr. Neven Kostic GmbH (idea), monotti angeli Consulenti SA (Plots C & D), Ferrari Gartmann AG (plot A), Arsalin Engineering Design (Engineer of File), Edge Consulting Engineering (Column Talab connection), Power Robust Mgcwll (Pre-Lab de Sor)
Panorama design: Catherine Dumont d’Ayot (C & D plot)
Concrete guide: Baukolorit AG, Marianne Huber
Site visitors engineering: P. Argus GmbH, Ivan Kosarev
3D site visitors simulation: Alden Studio
Illuminated design: Siegrun Appelt with Mathias Burger
photographer: Maxime Delvaux | @Maxdelv